High Wycombe
Olympic Way
Account manager - Ryan Marriott
System installed - Design, supply and commissioning of the window AOV system to the communal corridor areas and roof mounted ventilator units to the stair cores, incorporating a temperature control facility to offer natural ventilation for periods of excessive heat build.
Developer
Regal M&E Ltd
Project overview
The Olympic Way development is part of a £27m regeneration project that provides 164 new homes to replace the 1970’s built Lance Way Estate.


Work undertaken
Design, supply and commissioning of the window AOV system to the communal corridor areas and roof mounted ventilator units to the stair cores, incorporating a temperature control facility to offer natural ventilation for periods of excessive heat build.