High Wycombe

Olympic Way

Account manager - Ryan Marriott

System installed - Design, supply and commissioning of the window AOV system to the communal corridor areas and roof mounted ventilator units to the stair cores, incorporating a temperature control facility to offer natural ventilation for periods of excessive heat build.

Developer

Regal M&E Ltd

Project overview

The Olympic Way development is part of a £27m regeneration project that provides 164 new homes to replace the 1970’s built Lance Way Estate.

Work undertaken

Design, supply and commissioning of the window AOV system to the communal corridor areas and roof mounted ventilator units to the stair cores, incorporating a temperature control facility to offer natural ventilation for periods of excessive heat build.