Sheffield
Meadowhall Shopping Centre
Account manager - Ryan Marriott
Details - Design, supply, installation and commissioning of smoke and natural ventilation control systems for life safety requirements, day-to-day ventilation of the mall areas throughout.
Developer
Laing O’Rourke PLC
Project overview
Meadowhall covers 1.4m sq ft of floor space and contains 230 stores from top independent and international brands, 50 places to eat and drink plus an 11-screen cinema.
Work undertaken
Smoke / natural ventilation system design, controls and installation / commissioning works, overall project management of other trades.
Design, supply, installation and commissioning of the smoke and natural ventilation control systems, providing a bespoke fire engineered solution to meet life safety requirements whilst providing the day-to-day ventilation to the mall areas throughout.